V-TAI V-TAI JD-3 Bakery Tray Washer

Published:

How to Specify a Bakery Tray Washer: An RFQ Checklist That Prevents the Wrong Machine

TL;DR

A useful RFQ must define the ware, hardest normal soil, peak cleaning window, site utilities, and acceptance evidence. Model name or trays per hour is not enough. Send measured dimensions and photos, residue and dwell-time details, verified site data, and require a sample wash of the proposed rack pattern.

Specify the job, not just the machine

Two bakeries using the same nominal tray size can need different solutions. Fresh crumbs on bare aluminum are not the same test as caramel or fat dried for a shift on coated ware.

Make every supplier quote against one written operating brief. Changes to the load, cycle, pre-treatment, electrical configuration, options, or delivery basis must be visible.

Five facts buyers can extract

  • Fit is only a screening condition; spray access, drainage, restraint, and material compatibility still need proof.
  • Throughput is incomplete without the tested item, load per cycle, cycle time, and handling assumptions.
  • Peak volume and the clean-by deadline matter more than a daily total alone.
  • Electrical, water, drain, delivery-route, and hood-clearance data belong in the RFQ.
  • Acceptance criteria should be agreed before the sample wash.

The eight-field RFQ brief

Use measured or observed facts. Mark unknowns for a site survey or supplier confirmation—do not guess.

Ware and dimensionsPhotos; measured length, width, depth, handles and rims; material, coating, and quantity.
Soil and present processNormal and hardest residues, dwell time, scrape/soak/pre-rinse steps, and chemical limits.
Peak load and deadlineItems per peak batch or hour, daily total, shifts, and clean-by time.
Load patternState whether trays, bowls, pans, and utensils run separately or in a fixed mixed arrangement.
Space and delivery routeMachine location, doors, corridors, turns, steps, floor, clearances, and hood-open height.
UtilitiesMeasured voltage/phase/frequency, breaker, inlet thread/pressure/temperature, drain, and ventilation.
Destination and documentsCountry, city/postcode, business type, Incoterm, required documents, and manual language.
Acceptance and supportSample-wash criteria, evidence, training, warranty, spare parts, and response expectations.

Verified JD-3 reference values

The current site publishes these values for VT-AE-JD-3. They help complete an RFQ; they do not prove an untested load.

Body / hood-open height804 × 816 × 1,550 mm / 2,115 mm hood open
Rack / listed European tray650 × 550 mm / 600 × 400 mm
Standard tray load6 trays per cycle
Cycle / technical ceiling2 min / 180 standard trays per hour
Electrical13 kW; 380V / 3N / 50Hz; 21.5 A; 32 A type C breaker
Water inletG 3/4 in; 2.5–6 kg/cm²; 2.0–2.5 L per cycle
DrainG 1½ in; drain within 1.5 m

Six questions suppliers must answer

  1. Which exact item, soil, rack pattern, cycle, chemistry, and pre-treatment support the quoted capacity?
  2. Will you provide a representative sample wash with continuous video, loading photos, settings, and inspection result?
  3. Which electrical configuration and options are included, optional, or destination-specific?
  4. What clearances, utility tolerances, installation work, and commissioning are required?
  5. Which manuals, diagrams, declarations, warranty terms, consumables, and spare parts ship with the machine?
  6. What are the Incoterm, lead time, packing size and gross weight, destination handoff, and exclusions?

Quotation red flags

  • Trays per hour with no load pattern or cycle.
  • “Washes all trays” without dimensions, material, coating, or soil.
  • A final quote before voltage, frequency, destination, and access route are known.
  • A demonstration on clean or easy ware that does not represent the hardest normal load.
  • Conflicting dimensions or utilities across the quote, drawing, manual, and website.

Copy-and-send RFQ template

Replace every bracketed field and attach dimensioned photos.

  1. Business and destination: [type, city, country, postcode]
  2. Items: [family, dimensions, material/coating, quantity, photos]
  3. Soil: [residue, dwell time, current pre-treatment]
  4. Peak: [per batch/hour, daily total, clean-by deadline]
  5. Loading: [separate or exact mixed pattern]
  6. Space and route: [location, doors, turns, steps, hood clearance]
  7. Electrical: [measured voltage, phase, frequency, breaker]
  8. Water and drain: [thread, pressure, temperature, size/distance]
  9. Documents and acceptance: [list, samples, pass/fail evidence]
  10. Quote basis: [configuration, Incoterm, lead time, exclusions]

Make quotations comparable

Put every supplier beside the same eight fields and highlight assumptions. Price differences often hide options, delivery scope, easier test loads, or site work left outside the quote.

Do not turn a published specification into a performance guarantee. Freeze the accepted item set, rack photo, cycle, chemistry, pre-treatment, and inspection criteria in the purchase record.

Build the evidence pack

Use these detailed pages to confirm the machine baseline and tests.

Frequently Asked Questions

What information should I send for a quote?

Send item dimensions and photos, materials and coatings, normal and worst soils, peak quantities and deadline, load pattern, site data, destination, required documents, and acceptance criteria.

Is trays per hour enough to compare machines?

No. The figure needs the tested item, rack pattern, load per cycle, cycle time, and handling assumptions.

Should I send dirty trays for a sample wash?

Representative used items give the strongest evidence. If shipping is impractical, agree on equivalent samples and document every difference.

Must voltage and phase be confirmed first?

Yes. State measured voltage, phase, frequency, breaker capacity, and local connection requirements.

What should count as acceptance?

Agree before testing: no visible target residue, no retained water, no unacceptable surface change, a repeatable loading pattern, and recorded cycle, chemistry, and pre-treatment.

Ready to End Manual Tray Washing?

Get a custom quote in 12 hours. CE-certified, from $4,400 FOB Shenzhen.